I made this video this morning and I hope it help explain the flashing wall detail where the siding meets the roof.
It can be used up to go right here cialis generika once a day as needed.
Video Rating: 4 / 5

Get A Roofing Contractor In New Orleans, Louisiana To Give You A Quote Call 504.327.5840 Ext. 2


3 Comments

mindfuldance · September 24, 2014 at 12:22 AM

How far up does the ice and water shield need to go up behind the siding?

TheFlapturn · September 24, 2014 at 1:07 AM

Unfortunately this was already built and could not show that particular
detail regarding the j channel. If you look closely, you can see the ice
and water shield from the roof wraps up onto the siding wall and the house
wrap from the siding is installed over the top of the step flashing.
Depending on where you live, some building codes don’t require some of
these things. The best thing I’ve found is install to manufacturer’s specs.
Best of luck 🙂

TheFlapturn · September 24, 2014 at 1:39 AM

GAF recommends a minimum of 5 inches.

Comments are closed.